PROJECTS
Torrens to Torrens Project
Gunia Plant Hire has been contracted for supplying earthmoving equipment and machinery for the Torrens to Torrens Project. This project aims to construct a 4 km, non-stop, roadway, connecting Torrens Road to River Torrens. The project is expected to be completed by the end of 2018 and is estimated to come at a cost of a little under $805 million.
Key features of this 4km roadway will include:
- 3 km, lowered, the roadway connecting Pym Street, Gawler Avenue, Croydon Park and Hindmarsh (West).
- Surface roads constructed parallel, connecting these suburbs to South Road.
- Significant savings in commute time for locals as well as freight carriers.
For more information about this project, click here.
Darlington Upgrade Project
The Darlington Upgrade Project includes construction of 8 bridges aimed at easing the flow of traffic between:
- Ayliffes
- South & Shepherds Hill Road
- Main South Road & Ayliffes Road
These bridges will improve the connectivity between these suburbs and are expected to be completed by 2019. The total cost of the project is estimated to be $620 million.
Gunia Plant Hire is the official contractor for catering to all earthmoving and earthworks needs for the Darlington Upgrade Project.
For more information about this project, click here.
Darlington Upgrade Project
The Darlington Upgrade Project includes construction of 8 bridges aimed at easing the flow of traffic between:
- Ayliffes
- South & Shepherds Hill Road
- Main South Road & Ayliffes Road
These bridges will improve the connectivity between these suburbs and are expected to be completed by 2019. The total cost of the project is estimated to be $620 million.
Gunia Plant Hire is the official contractor for catering to all earthmoving and earthworks needs for the Darlington Upgrade Project.
For more information about this project, click here.
Northern Connector Project
Under the Northern Connector Project, a 15.5 km, 6-lane, motorway is being constructed aimed at connecting Northern Expressway, Port River Expressway and the South Road Superway. The total project cost is estimated to be $708 million and the project is expected to be completed by end of 2019.
We are associated with the project for supply of earthwork equipment, operators and supervisors.
For more information about this project, click here.

RAAF Air 7000 Project
The RAAF Air 7000 Project aims at constructing infrastructure for the Boeing P-8A Poseidon aircraft to 5 different RAAF Bases across Australia:
- Edinburgh in South Australia
- Darwin in Northern Territory
- Pearce in Western Australia
- Townsville in Queensland
- HMAS Stirling in Western Australia
Gunia Plant Hire is the contractor for this project, catering to all of its earthmoving and earthworks needs.
For more information about this project, click here.
RAAF Air 7000 Project
The RAAF Air 7000 Project aims at constructing infrastructure for the Boeing P-8A Poseidon aircraft to 5 different RAAF Bases across Australia:
- Edinburgh in South Australia
- Darwin in Northern Territory
- Pearce in Western Australia
- Townsville in Queensland
- HMAS Stirling in Western Australia
Gunia Plant Hire is the contractor for this project, catering to all of its earthmoving and earthworks needs.
For more information about this project, click here.

Aldi Project
Port Macquerie Project
TECHNICAL EXPERTISE AND EXCELLENT WORKMANSHIP GUARANTEED
For professional earthmoving, call Gunia Plant Hire today.